Categories: News

Damaged submarine cable slows down internet to the US

Telekom Malaysia has announced that it has detected a “fault” on the Asia-America Gateway (also known as the AAG) submarine cable system at a segment near the Philippines linking Malaysia to the United States and North Asia. The damaged segment is causing slow connections to sites and servers hosted in the US and North Asia when accessed from Malaysia.

The consortium that manages and maintains the AAG (in which TM is a part of) have already started repairs, service is expected to return to normal by Saturday 7 Feb — that is, if weather and sea conditions remain ideal. In the meantime, TM is diverting traffic to alternative routes to minimise impact to user.

Located along one of the busiest sea lanes in the world, the AAG is prone to damage both by ships and weather conditions. The last time the AAG cable system was damaged was in September 2014 and it took almost a month for restoration works to be completed.

If you have any questions or require any assistance, you can get in touch with TM via email at help@tm.com.my for Streamyx customers and unifi@tm.com.my for UniFi customers, or you can reach them on Twitter at @TMConnects.

[source]

Recent Posts

Cinematic Muscle, Mid-Range Price: Why the Xiaomi TV S Pro Mini LED 75” (2026) is the Year’s Biggest TV Disruptor

This post is brought to you by Xiaomi. Finding a large 4K TV with advanced…

40 minutes ago

Kelle Energy and EVC to rollout 100 Mobile EV Chargers in Malaysia

Kelle Energy, a Singapore-based clean energy technology company, today officially launched their Mobile EV Chargers…

4 hours ago

Proton e.MAS 7 PHEV is now official: Available from as low as RM105,800

Pro-Net has officially launched the new Proton e.MAS 7 PHEV, which is the first plug-in…

6 hours ago

Zeekr 9X coming to Malaysia: 1,381hp luxury 6-seat PHEV, expected to be priced above RM500K

Zeekr will soon introduce its new flagship SUV, the Zeekr 9X, in Malaysia. Measuring over…

1 day ago

Record high 3,276 Proton e.MAS EVs delivered in January 2026

Pro-Net is starting 2026 with a bang, delivering a record-high 3,276 EVs in January 2026.…

2 days ago

Gentari Go discontinues Power Pass subscription plans

This is your last call to pick up a Gentari Go Power Pass membership plan…

4 days ago

This website uses cookies.