• 中文版
  • BM
  • News
  • Deals
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Tech
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • Tune Talk
    • U Mobile
    • Unifi
    • Yes
  • Cars
  • Contribute
  • Jobs
Menu
  • 中文版
  • BM
  • News
  • Deals
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Tech
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • Tune Talk
    • U Mobile
    • Unifi
    • Yes
  • Cars
  • Contribute
  • Jobs
Search
  • Tech
    • News
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • U Mobile
    • Unifi
    • Yes
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Buyer’s Guide
  • Opinions
  • Digital Life
  • Video
  • Deals
  • How-To
  • Cars
  • Bahasa Melayu
  • EV
  • Contribute
  • Advertise
Menu
  • Tech
    • News
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • U Mobile
    • Unifi
    • Yes
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Buyer’s Guide
  • Opinions
  • Digital Life
  • Video
  • Deals
  • How-To
  • Cars
  • Bahasa Melayu
  • EV
  • Contribute
  • Advertise
Search
Close
Home News

Honda Malaysia installs 5.6MW Solar PV system and BESS at Melaka plant

  • BY Janarrthine Kannan
  • 27 July 2026
  • 12:01 pm
  • Comment
Share on FacebookShare on Twitter

Honda Malaysia has officially completed its first solar installation project at its Melaka manufacturing plant in Alor Gajah, a RM14 million investment aimed at slashing its carbon footprint as part of Honda’s global vision to hit total carbon neutrality by 2050.

Officiated by Melaka Chief Minister Datuk Seri Utama Ab Rauf bin Yusoh, the setup makes Honda Malaysia one of the early industrial electricity consumers in the country to implement a Battery Energy Storage System (BESS) alongside a large-scale solar array.

Honourable Datuk Hajah Kalsom binti Nordin  – EXCO for Women, Family and Community Development, Honourable Datuk P. Shanmugam a/l V.Pitchay – EXCO for Youth, Sports and Non-Governmental Organisations (NGOs) cum Member of the Melaka State Legislative Assembly for Gadek, Yang Amat Berhormat Datuk Seri Utama Abdul Rauf bin Yusoh – Chief Minister of Melaka, Mr. Narushi Yazaki – Managing Director & Chief Executive Officer of Honda Malaysia, and Ir. Sarly Adle Sarkum – President & Chief Operating Officer of Honda Malaysia.

8,960 solar panels to slash emissions by 10%

The Solar PV System Inauguration Ceremony is officiated by Yang Amat Berhormat Datuk Seri Utama Ab Rauf bin Yusoh, Chief Minister of Melaka.

Honda Malaysia has outfitted the rooftops of its Melaka facility with approximately 8,960 solar panels. The system boasts a total installed capacity of over 5.6 Megawatts (MW) and is projected to generate roughly 7,042 Megawatt-hours (MWh) of clean electricity every year.

This setup will cut the facility’s carbon footprint by 4,584 tonnes of CO2 annually, effectively cutting the Melaka plant’s overall carbon emissions by around 10%. Beyond reducing its reliance on traditional grid power, the initiative ensures local vehicle assembly operates on significantly greener energy moving forward.

What is the BESS setup about?

The RM14 million investment reinforces Honda Malaysia’s commitment to sustainable manufacturing, positioning the company as a pioneer among industrial electricity consumers in Malaysia in the implementation of a Battery Energy Storage System (BESS).

Solar power is great when the sun is shining, but managing energy flow requires a bit more tech. To handle this, Honda Malaysia integrated a Battery Energy Storage System (BESS) into the facility.

The BESS acts as a massive bank that stores excess solar power generated during peak sunlight hours. That stored energy can then be dispatched whenever needed, creating a stable, efficient, and consistent supply of clean energy for operations.

In addition to the physical setup, Honda Malaysia achieved a 3.07 star rating under the Climate and Sustainability Industry Readiness Index (COSIRI), proving its ESG framework is more than just marketing speak. The project was also supported by the government’s Green Investment Tax Allowance (GITA).

Expansion to Shah Alam coming in 2027

Mr. Narushi Yazaki – Managing Director & Chief Executive Officer of Honda Malaysia Sdn. Bhd., delivering his speech at the Solar PV System Inauguration Ceremony, held at the Honda Malaysia Melaka Plant, Alor Gajah.

The green push isn’t stopping at Alor Gajah. According to Honda Malaysia Managing Director and CEO Narushi Yazaki, the company plans to expand its solar installations to its Parts Supply Warehouse in Bukit Jelutong, Shah Alam, by 2027.

Beyond manufacturing facilities, Honda’s dealership network is also adopting greener practices like rainwater harvesting and proper battery disposal. On the road side of things, Honda continues to expand its e:HEV hybrid lineup, offering Malaysian buyers efficient electrified options alongside its greener manufacturing efforts.

Tags: Battery Energy Storage SystemBESSHonda MalaysiaHonda Melaka PlantSustainability
Janarrthine Kannan

Janarrthine Kannan

POPULAR

Honda Malaysia installs 5.6MW Solar PV system and BESS at Melaka plant

July 27, 2026

How fast is ULTRA5G inside KL Malls? Here’s What Dedicated Indoor ULTRA5G Infrastructure Can Actually Do

July 16, 2026

KTM Komuter and ETS disrupted today: Here is what’s causing the train delays

July 23, 2026

U Mobile suffers nationwide network outage in the early hours of the morning

July 22, 2026

Touch ‘n Go rolls out Enhanced RFID lane at AKLEH, targets 10 lanes by year-end

July 21, 2026

Samsung Galaxy Z Fold 8 hands-on: This is the Fold we’ve been waiting for, with one catch

July 22, 2026

Copyright © 2025 · SoyaCincau.com
Mind Blow Sdn Bhd (1076827-P)

  • ADVERTISE
  • DISCLAIMER

Copyright © 2026 · SoyaCincau.com – Mind Blow Sdn Bhd (1076827-P)

  • ADVERTISE
  • DISCLAIMER