• 中文版
  • BM
  • News
  • Deals
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Tech
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • Tune Talk
    • U Mobile
    • Unifi
    • Yes
  • Cars
  • Contribute
  • Jobs
Menu
  • 中文版
  • BM
  • News
  • Deals
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Tech
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • Tune Talk
    • U Mobile
    • Unifi
    • Yes
  • Cars
  • Contribute
  • Jobs
Search
  • Tech
    • News
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • U Mobile
    • Unifi
    • Yes
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Buyer’s Guide
  • Opinions
  • Digital Life
  • Video
  • Deals
  • How-To
  • Cars
  • Bahasa Melayu
  • EV
  • Contribute
  • Advertise
Menu
  • Tech
    • News
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • U Mobile
    • Unifi
    • Yes
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Buyer’s Guide
  • Opinions
  • Digital Life
  • Video
  • Deals
  • How-To
  • Cars
  • Bahasa Melayu
  • EV
  • Contribute
  • Advertise
Search
Close
Home Digital Life

Tan Chong Group unveils 20MW floating solar power plant in Serendah

  • BY Sharil Abdul Rahman
  • 19 February 2024
  • 11:23 am
  • Comment
Share on FacebookShare on Twitter

TC Sunenergy Sdn Bhd, a subsidiary of Tan Chong Group, announced that their Floating Large-Scale Solar Photovoltaic (LSSPV) plant in Serendah, has successfully commenced operations in providing green energy on 5 January 2024. The project is the result of the group’s participation in the 20-megawatt (MW) solar photovoltaic (PV) project, parked under the Large Scale Solar Photovoltaic Plant (LSSPV) Bidding Cycle 4 (LSS@MEnTARI) by the Energy Commission of Malaysia in 2020.  

As part of the project, the 20MW floating solar panel farm was built on Sungai Rawang – Serendah Lake (which is located next to Tan Chong Motor Assemblies Sdn Bhd) and is expected to supply over 1,000,000 Megawatt Hours (MWh) of green energy to Tenaga National Berhad under a 25-year Power Purchase Agreement (PPA). The PPA was originally set for 21 years but received a 4-year extension in 2022.

TC Energy said that the green energy supply would see a reduction of 610,221 tonnes of CO2 (Carbon Dioxide) emissions to the atmosphere, equivalent to removing 132,656 units of cars from the road or planting 29,058,175 trees.

The floating solar plant that can be seen from the North-South Highway

TC Energy also used only 60% of the water surface for the solar farm so the diversity of the local flora/fauna ecosystem and maintaining the water quality. The project complies with the guidelines of the Environmental Management Plans provided by Lembaga Urus Air Selangor (LUAS) and the Department of Environment (DOE).

“TCS Floating LSSPV – Serendah is an important milestone signifying the Group’s first venture into the renewable and sustainable energy sector. TCMH Group is pleased to be able to play our part in conserving the environment for our future generations,” said Daniel Ho, Group Chief Executive Officer of TCMH.

Tags: Edaran Tan Chong MotorElectricSolarSolar FarmSolar PowerSolar Power PlantTC Sunergy Sdn BhdTNB
Sharil Abdul Rahman

Sharil Abdul Rahman

POPULAR

Bringing the vivo X500 Pro Max to Zepp KL: A closer look at vivo’s concert fancam features

October 30, 2026

Tan Chong Group unveils 20MW floating solar power plant in Serendah

February 19, 2024

Google Elmina data centre is now live: Puncak Alam, Serendah, Port Dickson in the works

November 4, 2026

Tuju finally “fixes” its navigation problem on Android, and it’s brilliant

November 2, 2026

Google funds RM651 million shared water facilities in Negeri Sembilan to support new data centre

November 2, 2026

ColorOS 17 coming to Malaysia with Living Flow UI, System-Level AI Agents and 6-year smoothness guarantee

October 15, 2026

Copyright © 2026 · SoyaCincau.com
Mind Blow Sdn Bhd (1076827-P)

  • ADVERTISE
  • DISCLAIMER

Copyright © 2026 · SoyaCincau.com – Mind Blow Sdn Bhd (1076827-P)

  • ADVERTISE
  • DISCLAIMER