• 中文版
  • BM
  • News
  • Deals
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Tech
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • Tune Talk
    • U Mobile
    • Unifi
    • Yes
  • Cars
  • Contribute
  • Jobs
Menu
  • 中文版
  • BM
  • News
  • Deals
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Tech
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • Tune Talk
    • U Mobile
    • Unifi
    • Yes
  • Cars
  • Contribute
  • Jobs
Search
  • Tech
    • News
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • U Mobile
    • Unifi
    • Yes
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Buyer’s Guide
  • Opinions
  • Digital Life
  • Video
  • Deals
  • How-To
  • Cars
  • Bahasa Melayu
  • EV
  • Contribute
  • Advertise
Menu
  • Tech
    • News
    • Mobile
    • Computers
    • Cameras
    • Wearables
    • Audio
    • Drones
  • Telco
    • Celcom
    • Digi
    • Maxis
    • Time
    • U Mobile
    • Unifi
    • Yes
  • Reviews
    • First Impressions
    • Hands-on
    • Comparisons
  • Buyer’s Guide
  • Opinions
  • Digital Life
  • Video
  • Deals
  • How-To
  • Cars
  • Bahasa Melayu
  • EV
  • Contribute
  • Advertise
Search
Close
Home Transport

MRT 2: Putrajaya Line 100% operational from Kwasa Damansara to Putrajaya Sentral on 16 March

  • BY Alexander Wong
  • 3 March 2023
  • 11:22 pm
  • Comment
Share on FacebookShare on Twitter

The entire MRT 2 Putrajaya Line will finally be fully operational starting Thursday, 16 March 2023 at 3pm. The opening of Phase 2 of the new MRT line was shared by MRT Corp and commuters can travel from Kwasa Damansara all the way to Putrajaya Sentral.

MRT 2 Putrajaya Line (formerly known as SSP: Sungai Buloh-Serdang-Putrajaya Line) is the second MRT line in Malaysia and it uses Hyundai-Rotem train sets that come with a distinctive duck face design in red. The line has a total of 49 driverless train sets consisting of four cars with a maximum capacity of 1,204 per train.


Phase 1 of MRT 2 Putrajaya Line was opened on 16th June 2022 with a total of 12 stations from Kwasa Damansara to Kampung Batu. On 16th March, commuters will be able to continue their journey down south through Kentonmen, Jalan Ipoh, Sentul Barat, Titiwangsa, Hospital Kuala Lumpur, Raja Uda, Ampang Park, Persiaran KLCC, Conlay, Tun Razak Exchange (TRX), Chan Sow Lin, Kuchai, Taman Naga Emas, Sungai Besi, Serdang Raya Utara, Serdang Raya Selatan, Serdang Jaya, UPM, Taman Equine, Putra Permai, 16 Sierra, Cyberjaya Utara, Cyberjaya City Centre and Putrajaya Sentral.

MRT 2 Phase 2 has a couple of interchange and connecting stations which include Kwasa Damansara (MRT 1), Titiwangsa (Monorail, Ampang/Sri Petaling LRT), Ampang Park (Kelana Jaya Line), Tun Razak Exchange TRX (MRT 1), Chan Sow Lin (Ampang/Sri Petaling LRT), Sungai Besi (Sri Petaling LRT) and Putrajaya Sentral (KLIA Ekspres/Transit).

Related reading

  • MRT 2: Putrajaya Line to start operations on 16 June, here are the twelve stations under Phase 1
  • Keluarga Malaysia Travel Pass: Family of four can enjoy unlimited public transport trips for RM15 per day
  • Does Malaysia’s public transport suck? Or are we just too “lazy”? | DWIBAHASA
  • MRT 3: Here is the list of stations for Klang Valley’s upcoming Circle Line
Tags: Kwasa DamansaraMRTMRT 2MRT Putrajaya LinePutrajayaPutrajaya SentralRapid KL
Alexander Wong

Alexander Wong

POPULAR

MRT 2: Putrajaya Line 100% operational from Kwasa Damansara to Putrajaya Sentral on 16 March

March 3, 2023

Proton S70 i-GT 1.5 NA is now official: Priced from as low as RM56,800

September 22, 2026

New MyKad hits another snag: MyDigital ID online registration not ready yet

September 20, 2026

Don’t rush to replace your MyKad: New card faces eKYC verification issues

September 19, 2026

How Do You Want to Pay for Your iPhone 18 Pro? 3 Ways to Get More Value

September 18, 2026

Xiaomi 18 Pro series coming to Malaysia this year with Privacy Display, Snapdragon 8 Elite Gen 6

September 24, 2026

Copyright © 2026 · SoyaCincau.com
Mind Blow Sdn Bhd (1076827-P)

  • ADVERTISE
  • DISCLAIMER

Copyright © 2026 · SoyaCincau.com – Mind Blow Sdn Bhd (1076827-P)

  • ADVERTISE
  • DISCLAIMER