Categories: News

Air Selangor: Water supply being restored in stages, full restoration by Friday afternoon

Klang Valley residents will soon get their water supply as Air Selangor has began its restoration process at 3pm. It was announced this morning that the four water treatment plants at Rantau Panjang, SSP 1, 2 and 3 have resumed operations at 2.40am this morning.

A total of 1,279 areas in the Klang Valley were affected by water cuts since yesterday evening after contamination as high as 8 TON was detected in Sungai Selangor. As a result, the water treatment plants had to shutdown while millions of litres of water were released from dams to flush out the contaminants.

According to the latest update, the water supply restoration will be done in two phases. A total of 599 areas under phase 1 will be restored fully by 3.00pm on Thursday, 12th November 2020. Meanwhile, the remaining 680 areas in phase 2 will be fully restored by 3.00pm on Friday, 13th November.

You can refer to the full schedule below:

Air Selangor has deployed 111 water tanker trucks to provide water supply to critical areas such as hospitals, dialysis centres and residential areas. Alternatively, affected residents can also get immediate water supply at the 14 public water taps and 17 static tanks.

According to the statement, Air Selangor has expressed disappointment on the frequent water contamination which causes the sudden shutdown of its water treatment plants. They will provide full support to authorities to tackle environmental crimes to ensure that our water source will not be contaminated.

[ SOURCE, IMAGE SOURCE ]

Related reading

Recent Posts

Malaysia EV registrations nearly double in June 2026, Proton e.MAS 5 leads again

Malaysia's electric vehicle (EV) market continue to show strong momentum in June 2026, with 6,215…

2 hours ago

Mercedes-AMG CLA 45 goes electric with 671hp and AMG four-cylinder sound

Mercedes-AMG has unveiled the new CLA 45 4MATIC+, and for the first time, it is…

8 hours ago

Tesla Model Y Long Range AWD discontinued from Malaysia lineup, inventory units still available

Tesla Malaysia has removed the Model Y Long Range AWD from its online configurator, leaving…

15 hours ago

ChargEV deploy 6 EV Charge Points at Aeon Mall Taiping

If you're heading to Taiping, there are now more EV chargers in town. ChargEV has…

1 day ago

JomCharge and DBKL turn on EV Chargers at Laman Rimbunan Kepong

JomCharge and DBKL continue to turn on more street-level EV chargers in Kepong and the…

1 day ago

Microsoft Surface Laptop and Surface Pro with Snapdragon X2 available in Malaysia on 23 July, priced from RM6,999

Microsoft has announced that its latest Surface Laptop 8 and Surface Pro 12 laptops powered…

1 day ago

This website uses cookies.